Skip to content

Building foundations at Swindon Town Football Club

Share to:

Hills Quarry Products’ Type 3 aggregate was recently chosen for the construction of a full size artificial turf pitch at Swindon Town FC Community Foundation’s new £2.4million club hub facility.

Type 3 aggregate is a permeable sub-base used for the construction of sports pitches due to its superb drainage ability. Hills supplied 5,500 tonnes of Type 3 which is used underneath the high performance sports pitch surface. The aggregate was supplied via Hills’ Rail Depot at Royal Wootton Bassett to the on-site contractor S&C Slatter which specialises in the design and installation of sports facilities. The volume of aggregate equated to 2.5 train loads.

Steve Ayres, FA Framework Manager at S&C Slatter, commented: “The ability of Hills to respond quickly and deliver our requirements to plan was impressive and key.”

Jon Holloway, Head of Swindon Town FC Community Foundation, added: “It is so exciting to see this facility being constructed after many years in the planning.”

For more information about Type 3 and other aggregates, visit here or call Hills Quarry Products’ sales team on 01793 714999.

Pictured left to right: Neil Watts, transport co-ordinator Quarry Products (and Swindon Town super fan), Toby Spearing, site manager S&C Slatter, Andy Shield, sales consultant Quarry Products and Jon Holloway, Head of Swindon Town FC Community Foundation.

Sign up for news updates

Get the latest news delivered straight to your inbox.


Hills Quarry Truck

© 2025 Hills Group

Website by Red Rocket